The Dollar Tree distribution center is a heavy-load warehouse facility built to support high-volume freight operations. Geo-Tech was engaged as the geotechnical engineer and materials testing firm, pairing geophysical exploration with SPT soil boring analysis to characterize the site and guide foundation and pavement design. Density testing, threshold inspections, and concrete strength verification carried the project through vertical construction.
Have a distribution, warehouse, or industrial project in North or Central Florida? Talk to Geo-Tech about your site.
Project at a glance
Location
Sector
Client Role
Services Provided
Planning a similar build?
More Projects